Details: rain water harvesting & well recharge- direct 100 nos 2.6.1 earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavatedearth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds ofsoil 50.6.7.1laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cementmortar 1:6 for foundation and basement including all cost of materials, labour charges etc. providing and placing on terrace (at all floor levels) polyethylene water storage tank isi marked,with cover and suitable locking arrangement and making necessary holes for inlet, outlet and rover flow pipes but without fixings and the base support for tank. 23.6 supplyln& filling, spreading & lweling gravels of si:e range s mm to 10 mm, in the recharge piloverthe edstln8layer of boulders, in required thickness, for all leads &
Sector: Horticulture