Details: reconstruction of ledge demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 500 metres lead as per direction of engineer -in-charge. solid block masonry using pre cast solid blocks (factory made) of size 30x20x20cm or nearest available size confirming to is 2185 part i of 1979 for foundation and plinth with thickness 20cm and above in: cm 1:6 ( 1 cement : 6 coarse sand ) etc complete centering and shuttering including strutting, etc. and removal of form for:suspended floors, roofs, landings, balconies and access platform steel reinforcement for r.c.c work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelthermo - mechanically treated bars of grade fe-500d or more providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level:1:1:5:3
Sector: Logistics and warehouses