Details: contract capacity (mw) (max 22 mw and minimum 10 mw) annual contracted energy for year 1 (mu) quoted tariff (inr/kwh) (rounded to 2 decimal points) transmission charges (stu gen + drawal) in inr / kwh transmission loss charges (stu gen+drawal) in inr / kwh ists charges in inr / kwh ists lose in inr / kwh cross subsidy surcharge in inr / kwh additional surcharges in inr / kwh sldc scheduling & operating charges ( gen+drawal) in inr / kwh banking charges in inr / kwh application fee in inr / kwh taxes,duties(e.g electricity duty),cess,other surcharges etc in inr / kwh any other charges in inr / kwh sldc charges (gen+drawal) in inr / kwh total charges in inr / kwh (sum of the items 3-15) captive contribution requirement for tcc(in cash), considering tcc's 26 % equity contribution and after maximum borrowed funds for this equity contibution inr / mw investment of tcc during first year in inr
Sector: Industries and Factories