Description: LAYING OF 8IN 4IN NB UG STEEL PIPELINE AT BURDWAN GA Name of Work Steel pipeline laying and associated works at IOAGPL Burdwan GA
Details: Laying Works: In Soft SoilLoading, Unloading material from CGS ,Excavation, trenching, pipe line laying, welding, Radiography (100%), joint coating, lowering, laying of warning mat, hydro testing, pipe line cleaning , swabbing, site restoration, installation of route marker (as per norms of PNGRB), submission of as built drawing and pipe book , testing and commissioning including Nitrogen Purging. MATERIAL - "Receiving and taking over" as defined in the specifications, handling, loading, transportation and unloading of Owner supplied 3-Layer PE coated pipes & fittings from Owner's designated stack-yard to Contractor's stock yard/ workshop/ work-site. Execution of preliminary activities, preparation of drawings, wherever required for crossing etc. including handling, stacking, stringing on the pipeline in Right-of-Use/ pipeline route alignment. Carrying out inspection of company supplied materials including line pipes at the time of taking over, laying/ installation of coated line pipes
Sector: Petroleum