Description: Extension of Environmental Engineering Lab Name of Work Extension of Environmental Engineering Lab
Details: Carriage of Materials Dismantling PVC, C.I. or asbestos pipe up to 110 mm dia with fittings and clamps including stacking the material in the engineering unit store. EARTH WORK Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc.in layers not exceeding 20cm in depth, consolidating each deposited layers by ramming and watering lead upto 1Km and lift upto 1.5m etc. complete.including conveying the earth upto 1KM CEMENT CONCRETE (CAST IN SITU) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) deri
Sector: Science University