Description: SMART CITY UPGRADATION OF AZHANKAL WALKWAY HANGING BRIDGE IN THIRUVANANTHAPURAM Civil Works Name of Work Smart City Upgradation of Azhankal walkway Hanging Bridge in Thiruvananthapuram Civil works
Details: Civil works Conducting Soil Investigation, Detailed Report and connected works, etc. at 2 banks of the river Dismantling of existing steps and levelling the ground for providing pile and pile cap (As per actuals) Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil Making bund by using coconut piles and sheets and filling with contractor's own earth fit for the pile driving with all accessories including material and labour etc complete (As per actual material and Labour Supplied). Making a platform by filling with contractor's own earth fit for placing tripod with all accessories including material and labour etc complete Providing, driving and installing driven cast-in-situ r
Sector: Power Sector