Description: Construction of Fencing of B 18 Plot at ICAR IISR Experimental Farm Peruvannamuzhi Name of Work Construction of Fencing of B 18 Plot at ICAR IISR Experimental Farm Peruvannamuzhi
Details: Construction of Fencing of B 18 Plot at ICAR IISR Experimental Farm, Peruvannamuzhi -Annexure III Clearing of grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.A. Site Clearance -2 No. : 219 SQML- 73.00 B-1.50CF -1B. Site Clearance -2 No. : 180 SQM L- 60.00 B-1.50 CF -1 Excavation of earth by manual means in foundation trenches or drains (not exceeding 1.5 m in width) including dressing of sides and ramming of bottoms and getting out the excavated soil and disposal of surplus excavated soil as directed.- Lead upto 50m and lift upto 1.5m - Ordinary SoilFor Pole Base- 175 Nos.L- 0.30B- 0.30D- 0.35CF- 1Total Quantity – 5.513 CUM Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level:</br>1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)For Pole Base- 175 Nos.L- 0.30B- 0.30D- 0.35CF- 1Total Quantity – 5.513 CUM Steel work
Sector: Agriculture Misc