Details: stabilisation structures 15.17.1dismantling steel work in single sections including dismembering and stackingwithin 50 metes lead in:r.s. joists 2.32clearing grass and removal of the up to a distance of 50 m outside theperiphery of the area cleared. 2.6.1earth work in excavation by mechanical means (hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposedearth to be levelled and neatly dressed.all kinds of soil 4.1.5providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - all work up to plinth level:1:3:6 (1 cement : 3coarse sand : 6 graded stone aggregate 20 mm nominal size) 7.1.1random rubble masonry with hard stone in foundation and plinth including levellingup with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate20 mm nominal size) up to plinth level with:
Sector: Horticulture