Description: Annual Plan JP PTA 118 23 24 Mylapra Grama Panchayath Mekozhooril Volley ball Turf and Anubendha Soukaryangal General Civil Work RETENDER Work Name Annual Plan JP PTA 118 23 24 Mylapra Grama Panchayath Mekozhooril Volley ball Turf and Anubendha Soukaryangal General Civil Work
Details: TURF 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil 4.1.8:Providing and laying in position cement concrete of specified grade excluding
Sector: RDPR