Details: site clearance 2.3.1.b : clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness in area of thorny jungle -by manual means construction of jogging track 16.68 : providing and laying 60 mm thick factory made cement concrete interlocking paver block of m - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of engineer-in-charge. 4.1.8 : providing and laying in position cement concrete of specified grade excluding the cost of centering and shut
Sector: District Administration