Description: GENERAL JFM COURT no 1 ALUVA EI Mance Rectification of faulty electrical installation and fittings and providing UPS points in JFM No 1 court at Aluva General Electrical Work Work Name GENERAL JFM COURT no 1 ALUVA EI Mance Rectification of faulty electrical installation and fittings and providing UPS points in JFM No 1 court at Aluva General Electrical Work
Details: MAINTENANCE 1.10.1:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVCinsulated copper conductor single core cable in surface / recessed medium class PVC conduit,with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLSPVC insulated copper conductor single core cable etc as required.Group A 1.33:Supplying and fixing 3 pin, 5 amp ceiling rose on the existing junction box/ wooden block including connection etc as required. 1.17.3:Supplying and drawing following sizes of FRLS PVC insulated copper conductor, single core cable in the existing surface / recessed steel/ PVC conduit as required.3 X 1.5 sq.mm 1.17.5:Supplying and drawing following sizes of FRLS PVC insulated copper conductor, single core cable in the existing surface / recessed steel/ PVC conduit as required.5 X 1.5 Sq. mm 1.17.12:Supplying and drawing following sizes of FRLS PVC insulated copper conductor, single core cable in the existing surface
Sector: PWD