Details: water connection to hostel building 2.31 : clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared 50.18.9.4.1 : providing and fixing pvc pipes includings jointing of pipes with one step pvc solvent cement, trenching, refilling & testing of joints complete as per direction of engineer in charge.32 mm dia 10.kgf/cm2 50.18.9.14.1 : providing and fixing pvc pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. this includes jointing of pipes & fittings with one step pvc solvent cement and testing of joints complete as per direction of engineer-in-charge 32 mm dia 10 kgf/cm2 - external work- exposed on wall od170153/2023_2024 : providing and fixing pvc pipes includings jointing of pipes with one step pvc solvent cement, trenching, refilling & testing of joints complete as per dir
Sector: Industry Development