Details: schedule of works and boq bill of quantities for civil works charges for metal double scaffolding ( h-frame ): rate includes providing, erecting, shifting, transportation etc.complete to a maximum height of 12m (40ft) from the ground level. approximate length on one side is 15m (50ft).the scaffolding is to be erected on two opposite locations of building at a time as instructed by the engineer-in-charge.total expected area of scaffolding is 4200 sqft. the scaffolding is to be set ready for the masons/ welders/ fabricators to work on the roof top levels. rate for demolition of existing parapet wall(4.5" brick wall) to a height of 50 cm approx. including finishing the demolished surfaces with cement mortar, applying matching color paint etc. complete the work as directed by the engineer-in-charge. rate includes all the material, labor etc. with disposing off the debris from the campus. supply and fixing of galvalume steel roofing sheet matching with existing roofing sheet supported wit
Sector: Electronics