Description: Reapair and Painting of Steel Foot over Bridge at Thottappally across NW 3 Name of Work Repair Painting of Steel Foot over Bridge at Thottappally across NW 3
Details: Dismanting of existing rusted structures Dismanting & removal of rusted plates of the steps and broken wire mesh grill of the existing steel foot over bridge at Thottapally including the dismembering & stacking of plates within 50m lead including labour charges, scaffoldings,hire charges of genetator & tools for cutting, removal, stacking etc. complete. Repair work Providing and fixing of 6mm thick chequered MS plates of approved quality for replacing fully / partially rusted plates in existing steel foot over bridge including cutting, hoisting, welding, fixing in position at all levels and grinding the joints to a smooth finishing, including making of 1cm Ø 6 to 8 holes at 250mm C/C in the required locations of tread plates and on the landing portions, including applying of a priming coat of approved steel primer etc. as per the directions. The rate shall include the cost of materials, hiring of generator & welding machines, cutting, fixing, welding at all levels, scaffoldings and la
Sector: Harbor