Description: Clearing DR Masonry Demolishing RRM 1 6 PCC1 4 8 1 3 6 1 2 4 RCC Plastering Filling Work Name GENERAL MP RBC 2023 24 Modernisation of CADA field channel Urgent rectification works to CADA channel between Ch 0 500 to Ch 0 600 starting from the sluice of 19 820 Km of RBMC General Civil Work
Details: CADA WORK 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) 2.32:Clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site 4.1.8:Providing and laying in position cement concrete of speci
Sector: Irrigation