Description: Construction of the second floor RCC framed superstructure Work Name GENERAL GAC PARIYARAM NEW LADIES HOSTEL PHASE 3 SECOND FLOOR CONSTRUCTION OF SECOND FLOOR FOR NEW LADIES HOSTEL AT GAC PARAIYARAM General Civil Work 1
Details: Construction Of second Floor 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. 4.2.5:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) 5.8:Reinforced cement concrete work in vertical and horizontal fins individually or forming box louvers, facias and eaves boards up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1:11/2:3 (1 cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm
Sector: PWD