Description: As per NIT Name of Work Miscellaneous Civil Works at Infopark Phase II
Details: Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days, and then fine dressing for planting new grass, including disposal of all with all leads and lifts within Infopark. Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within Infopark. All kinds of soil Filling in specified areas including cost for excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan), loading, transportation and unloading of excavated earth for a lead up to 2km and lift
Sector: Information Technology