Description: Reconstruction of Bridge General Civil Work Work Name GENERAL Ottoor bridge Reconstruction of Ottoor bridge in Attingal LAC General Civil Work
Details: Bridge Proper OD142043/2021-2022:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. (60.1.1) OD38630/2022-2023:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etc complete 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means OD38646/2022-2023:Supplying and staking well matured straight coconut post for d
Sector: PWD