Description: Jal Jeevan Mission JJM Pipe line work 600 mm MS pipe line interconnection work for boosting Raw water to the existing plant at Cheekode Work Name Jal Jeevan Mission JJM Pipe line work 600 mm MS pipe line interconnection work for boosting Raw water to the existing plant Pipeline Work
Details: Extension and Interconnection of 600 mm MS pipe for boosting Raw Water pumping main 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. 100.37.14.1:In situ fabrication of M.S. pipes of size 600mm (I.D.) using 8mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete. 100.37.14.2:Fabricating M.S. flanges of diameter 600mm using 16mm thick M.S. plate including cost and conveyance charges of M.S. plate,
Sector: Water supply and Sewerage