Description: MAINTENANCE OF ROAD Name of Work MAINTENANCE OF ROAD IN THE WESTSIDE OF TECHNOPARK PHASE III CAMPUS TRIVANDRUM
Details: Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 250 m outside the periphery of the area cleared and leveling the ground for setouting etc. complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge. Earth work in excavation by mechanical means manual means over areas (exceeding 30 cm in depth) For foundation, pile cap, plinth beam etc. including getting out and disposal of excavated earth lead upto 250 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the
Sector: Electronics