Description: Modification of boiler feed water line in CPP Opening and boxing up of flanges valve replacement and other miscellaneous works in Hyam and Utilities Section during ATA 2023 Petrochemical Plants FACT UC Name of Work Modification of boiler feed water line in CPP Opening and boxing up of flanges valve replacement other miscellaneous works in Hyam and Utilities Section during ATA 2023 Petrochemical Plants FACT UC
Details: Modification of boiler feed water line in CPP, Opening and boxing up of flanges, valve replacement & other miscellaneous works in Hyam and Utilities Section during ATA 2023, Petrochemical Plants, FACT UC Modification of boiler feed water line to MP Heater in CPP by re-routing the line. Activity also includes 100% radiographic testing of welded joints. Dismantling, lifting & shifting of the PRDS 1 (PPV 9201) to ground floor and fixing it back. Dismantling, lifting & shifting of the PPV9205(41 Vent) to ground floor and fixing it back. Dismantling, lifting & shifting of the PPV9207(5 vent) to ground floor and fixing it back. Replacement of cooling water supply line interconnection Gate valve (600 NB, #150) at CPP near the cooling tower Opening and boxing up of flanges of size 50 NB of pressure rating 1500# Opening and boxing up of flanges of size from 80 NB to 100 NB of pressure rating 150# Opening and boxing up of flanges of size from 80 NB to 100 NB of pressure rating 300# Opening a
Sector: Industries and Factories