Description: RENOVATION OF TOILETS Name of Work Renovation of toilets in ground floor of Club House in Phase I Campus Trivandrum
Details: Dismantling tile work in floors and roofs laid in cement mortar including disposal of debris outside the technopark campus. For thickness of tiles 10 mm to 25 mm. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside the technoparkcampus etc. complete as per the direction of engineer in charge. Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of debris outside the technopark campus as per direction of Engineer-in-Charge. In cement mortar The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside the technoparkcampus etc. complete as per the direction of engineer in charge. Dismantling doors, windows and clerestory windows (steel or wood or PVC) shutter including chowkhats, architrave, holdfasts etc. complete and disposal of deb
Sector: Electronics