Description: Laying of interlock tile Name of Work Laying of interlock tile in front of Rain Water Harvesting Pond and rear side of STP near Nila building
Details: Laying of Interlock tile Clearing of jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 2km outside the periphery of the area cleared. The rate inclusive of all material charge, labour, transportation loading/Unloading at the work space etc. Complete as per the direction of engineer-in-charge. Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyound 60 cm girth up to and including 120 cm girth. The rate inclusive of all material charge, labour, transportation loading/Unloading at the work space etc complete as per the direction of engineer-in-charge. Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as
Sector: Electronics