Description: Retarring of CWRDM Campus road Phase 2--Name of Work:Retarring of of CWRDM Campus road, Phase 2
Details: Re-tarring of CWRDM Campus road, Phase – II 75.5.5.B.2pb: Modified Macadam 75 mm thick using Bitumen S-65.Construction of macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a wheel 80 – 100 KN static roller to achieve the desired degree of compaction as per Technical Specification clause 506. 75.5.5.A.1a: Modified Macadam 50 mm thick using Bitumen S-65.Construction of macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a wheel 80 – 100 KN static roller to achieve the desired degree of compaction as per Technical Specification clause 506. (B) 50 mm thick:- (II) Bitumen (S - 65) 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates & lt; br & gt: Providing and applying tack coat with Bitumen emulsion (RS-1)
Sector: Forest and Environment