Description: Annual Plan 2025 2026 Proj No 119 Ward 9 Restoration work General Civil Work Work Name Annual Plan 2025 2026 Proj No 119 Ward 9 Restoration work General Civil Work
Details: Ward 9 roads OD29429/2025-2026:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 50 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 50 mm and compacting, leveling by filling the undulations with three wheel static roller 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead 75.5.5.A.1pb:Modified Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rate
Sector: RDPR