Description: NORTH PARAVOOR MUNICIPALITY PROJECT 127 2025 2026CONSTRUCTION OF PALAMTHURUTH EAST MAIN ROADIL SOUTH AND NORTH BYE LANE AND WEST PUZHAYORAM ROAD BYE LANES RETARRING IN WARD NO 4 Work Name Annual Plan NORTH PARAVOOR MUNICIPALITY PROJECT 127 2025 2026CONSTRUCTION OF PALAMTHURUTH EAST MAIN ROADIL SOUTH AND NORTH BYE LANE AND WEST PUZHAYORAM ROAD BYE LANES RETARRING IN WARD NO 4 General Civil Work
Details: TAR ROAD WIDENING AND RETARING 3.1:Preparation of Foundation for Embankment Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing an
Sector: RDPR