Description: retarring Work Name Annual Plan 2025 26 Vadakke Colony Link Road Maintenance Ward 14 of Karalam GP Pro No 143 26 General Civil Work
Details: CONCRETE ROAD 75.5.5.A.1pb:Modified Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. 75.5.5.B.2pb:Modified Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the
Sector: RDPR