Details: construction of drainage work 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m <br> excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od533347/2024-2025:filling with quarry muck filling up low lying and water logged areas with local material/ quarry muck, spreading in layers ,leveling the top at site and consolidation by ramming ,etc complete for improving the cbr value of subgrade 11.4.1.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 <br> i. p.c.c grade m 10 <br> (i) nominal mix 1:3:6 11.4.2.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 <br>ii. p.c.c grade m 15 <br> (i) nominal mix (1:
Sector: RDPR