Details: road od493129/2024-2025:construction of sub grade and earthen shoulders construction of sub grade and earthenshoulders with approved material obtained from borrow pits with alllifts and leads, transportingto site, spreading, grading to required and compacted to meet requirement of table 300.2with lead upto 1000 m as per technical specification clause 303.1. (3.14 modified withincreased compensation and additional conveyance od45438/2025-2026:filling with quarry muck (modified 4.11.2 (table 400.13) by mix in place method normal. construction of granular sub-base by providing local material spreading in uniform layers on prepared surface and compacting with smooth wheel roller to achieve the desired density complete as per clause 401.4 as per technical specification clause 408. od8334/2025-2026:supplying and fixing 1/2 split coconut post at 2m interval, bamboo post and bamboo wailing with pe sheet for retaining earth including all charges. od50967/2025-2026:supplying and fixing name b
Sector: RDPR