Details: retaining wa;; 2.4.4.b:dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres dismantling stone masonry - rubble stone masonry in cement mortar. 12.1.5.b:earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. marshy soil depth upto 3 m (excluding shoring) - mechanical means od156664/2024-2025:dry rubble masonry using departmental rubble including all cost and conveyance all labour charges etc complete od156665/2024-2025:dry rubble masonry using good quality rubble including all cost and conveyance all labour c
Sector: PWD