Details: concrete od17385/2025-2026:filling with contractors own earth (exculding rock) in trenches ,plinths side of foundations ,etc in layers not exeeding 20cm in depth ,consolidating each deposited layer by ramming and watering ,led up to 50m and lift up to 1.50m as per direction of site engineer in charge . od17386/2025-2026:od1353171/2022-2023 filling with quuary muck filling and waterlogged areas wih local material quarry muck spreading in layers levelling the top at site and consolidation by ramming etc compleate for improving the cbr value of subgrade 75.8.1:providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4)
Sector: RDPR