Description: Mekkadu Devaswom in Ambalapuzha Group Filling earth inside temple and temple compound reg Name of Work Mekkadu Devaswom in Ambalapuzha Group Filling earth inside temple and temple compound reg
Details: Clearing the site by means of labour including clearing grass and removing waste Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. Labour Engaged for levelling the exes earth in line and level
Sector: Religious building