Description: monsoon preparedness2025 clearing the water way of kanniyar river uptream of nachivayal sahayagiri bridge in ward no 11 of marayoor gramapanchayath reach1 Work Name GENERAL Monsoon preparedness 2025 Clearing the water way of Kanniyar river U S of Nachivayal Sahayagiri bridge in ward no 11 of Marayoor Grama panchayath Reach 1 Clearing work General Civil Work
Details: clearing work 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Sector: Irrigation