Details: park 15.2.2:demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:4:8 leaner mix ( including equivalent design mix) 15.9.2:demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer -in- charges:in cement mortar 15.56:dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead. od1561/2025-2026:dismantling and stacking existing c . c. interlocking paver tiles including stacking material 50m lead as per the direction of departmental officers ... etc complete . 15.25:dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. od1567/2025-2
Sector: RDPR