Description: 86727 Annual Plan DPT TSR 2024 2025 MAINTANACE OF SHORNUR ROAD PATHAZHAKUNDU RESERVOIR ROAD THEKKUMKARA GP WADAKKANCHERY BP VAZHANI DIVISION Work Name Annual Plan DPT TSR 2024 2025 MAINTANACE OF SHORNUR ROAD PATHAZHAKUNDU RESERVOIR ROAD THEKKUMKARA GP WADAKKANCHERY BP VAZHANI DIVISION Pro No S1226 25 IN WADAKKANCHERY BP General Civil Work
Details: ROAD CONCRETING AND SIDE BERM PROTECTION 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 OD55976/2025-2026:Filling with quarry muck, filling up low lying and water logged areas with local material/ quarry muck spreading in layers leveling the top at site and consolidation by ramming etc. complete for improving the CBR value of sub grade 4.11.1:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method nor
Sector: RDPR