Description: QUOTATION Annual Plan EDATHALA GP Project No 529 24 25 Palancheri Puthiya Road Renovation in Ward 9 Work Name Annual Plan EDATHALA GP Project No 529 24 25 Palancheri Puthiya Road Renovation in Ward 9 General Civil Work
Details: retarring 2.15:Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202.<br> Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately 2.5.1.C:Dismantling of Structures<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.<br> (I) By Manual Means<br> (C) Reinforced Cement Concrete 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete
Sector: RDPR