Details: deepening od21763/2025-2026:desilting thodu using hydraulic excavator (clearing debris and silt from thodu ) depositing at the banks dressing etc complete. od21764/2025-2026:removal of unsuitable soil with disposal upto 1000m removal of unsuitable soil including loading and disposal upto 1000m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately asper clause 303.5.2 asper technical specification clause 302.3.11 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distanc
Sector: RDPR