Details: building construction 5.9.3:centering and shuttering including strutting, etc. and removal of form for:suspended floors, roofs, landings, balconies and access platform 5.9.5:centering and shuttering including strutting, etc. and removal of form for:lintels, beams, plinth beams, girders bressumers and cantilevers 5.11.1:extra additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentering at all levels, over a height of 3.5m, for every additional height of 1 metre or part thereof (plan area to be measured).suspended floors, roofs, landing, beams and balconies (plan area to be measured) 5.9.16.1:centering and shuttering including strutting, etc. and removal of form for:edges of slabs and breaks in floors and wallsunder 20 cm wide 5.33.2:providing and laying in position machine batched and machine mixed design mix m-25 grade cement concrete for reinforced cement concrete work, using cement content as per a
Sector: RDPR