Details: access development to the pond 2.31clearing jungle including uprooting of rank vegetation, grass, brush wood, trees andsaplings of girth up to 30 cm measured at a height of 1 m above ground level andremoval of up to a distance of 50 m outside the periphery of the area cleared od73420/2024-2025jcb work including labor, conveyance etc 16.1preparation and consolidation of sub grade with power road roller of 8 to 12 tonnecapacity after excavating earth to an average of 22.5 cm depth, dressing to camberand consolidating with road roller including making good the undulations etc. and rerolling the sub grade and disposal of surplus earth with lead upto 50 metres construction of 4m dia well bailing out water using pump above 5 hp and up to 10 hp-bailing out water withengine and pump set above 5hp and up to 10hp, including conveyance to site anderection,cost of fuel, lubrication oil and other stores, pay of staff etc complete 100.3.6.11earthwork in open well excavation (in
Sector: District Administration