Details: maintenance 3.5.1:excavation in cutting in soil by manual means with lead upto 50 m <br> excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od16913/2025-2026:filling with quarry muck - filling up low lying and water logged areas with local material/quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the cbr value of subgrade (modified dsr 51.2.3) od531162/2024-2025:interlocking concrete block pavementproviding and laying of interlocking concrete blcok pavements having thickness 60 mm as per drawing and technical specification clause 1504 75.8.1.1:providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete.
Sector: RDPR