Description: Area clearing Excavation Brick demolishing Concrete demolishing PCC RCC TMT Steel work Shuttering back filling Work Name CONSTRUCTION OF NEW DRAINAGE BETWEEN PPP M AND LNG STORAGE YARD
Details: AREA CLEARING Clearing grass,rank vegetation,shrubs,using grass cutting machine and removal of up to a distance of 500 m outside the periphery of the area cleared,including hire and running charges of all equipments,tools,consumables required for the job,all complete as per the direction of Engineer-in-charge. Earth work excavation Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil Brick work demolishing Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar Concrete demolishing Demolishing cement concrete manually / by mechanical means including disposal of material within 50 me
Sector: Mining