Details: road maintenance 2.5.2.a:dismantling of structures<br> dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per technical specification clause 202.<br>(ii) by mechanical means <br> (a) cement concrete od513419/2024-2025:granular sub-base with well graded material (table 400.1) <br> (a) by mix in place method <br> construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. <br> (i) for grading i material od
Sector: RDPR