Description: GENERAL Construction of E block in Govt College Karyavattom composite work Construction of New Building Including electrical pipe laying Electronics works Work Name GENERAL Construction of E block in Govt College Karyavattom Construction of E block Composite Work
Details: Appendix A - Building proper(Civil work) 2.32:Clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the e
Sector: PWD