Details: re-construction of retaining wall in puthan thodu - 2m ht, 129rm od1136/2024-2025 60.7.3 dismantling dr - dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in dr masonry including disposal of debris within a distance of 150m. 2.6.1 earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil od1135/2024-202560.7.8 dr with departmental. stone - dry rubble masonry _ dry rubblewithout concrete levelling course using departmental rubble including packing tocompactness to lines and levels, labour charges etc. complete as per direction ofdepartmental officers at site od1137/2024-25 dry rubble masonry _ dry rubble without concrete levelling course masonry with good quality blasted rubble including p
Sector: Horticulture