Details: dwss 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil od244668/2024-2025:dry rubble masonry without concrete levelling course masonry blasted rubble including packing to compactness to lines and levells,cost and conveyance of all materials labour charges etc.complete as per direction of departmental officers at site. 5.1.2:providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size 5.22.6:steel reinforcement for r.c.c work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelthe
Sector: RDPR