Details: side protection work 3.5.2:excavation in soil with dozer with lead upto 100 m excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. 75.8.1.1:providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4) 10.15:tubular steel railing on precast rcc posts, 1.2 m high above ground level providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast m-20 grade rcc vertical posts 175 mm x 175 mm x 1.8 m high (1.2 m above gl) with 3 holes 50 mm dia for pipe, fixed 2 m
Sector: RDPR