Details: appendix.a-proactive maintenance works 55.4:supplying and stacking 36mm size hard broken stone in standard heaps for measurement. 55.8.a:filling up holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. 55.2:supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(irc 3.2.1.a) 55.9.a:filling up holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. od312588/2024-2025:filling up potholes with bituminous ready mix compound(25kg bag) after cleaning the holes and compacting by ramming to get a compact surface including cost of materials,transportation, laying charges etc complete 5.2.a:providing and applying ta
Sector: PWD