Details: public well maintenace 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar 50.6.1.5:solid block masonry using pre cast solid blocks ( factory made) of size 30x20x20cm or nearest available size confirming to is 2185 part i of 1979 for super structure up to floor two level thickness 20cm and above in: cm 1:6 ( 1 cement : 6 coarse sand) etc complete 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) 13.44.1:finishing walls with water proofing cement paint of required shade:new work (two or more coats applied @ 3.84 kg/10 sqm) 4.1.3:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to pli
Sector: RDPR