Description: 1713 25 CONSTRUCTION OF GUARD RAIL AT HYDROSS PALLY ROAD IN DIVISION 10 Work Name Annual Plan PROJECT NO 1713 25 CONSTRUCTION OF GUARD RAIL AT HYDROSS PALLY ROAD IN DIVISION 10 CONSTRUCTION OF GUARD RAIL AT HYDROSS PALLY ROAD IN DIVISION 10 General Civil Work
Details: protection work 3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) Nominal mix (1:2:4) 10.15:Tubular Steel Railing on Precast RCC posts, 1.2 m high above Ground Level Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M-20 grade RCC vertical posts 175 mm x 175 mm x 1.8 m high (1.2 m above Gl) with 3 holes 50 mm dia for pipe, fixed 2 m cent
Sector: RDPR