Details: premonsoon works 2.2:clearing grass and removal of up to a distance of 50 metres outside the periphery of the area 2.3.2.a:clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness in area of light jungle - by mechanical means 14.1.a.1:furnishing and placing reinforced cement concrete grade m20 using concrete mixer in super-structure as per drawing and technical specification 14.2:supplying, fitting and placing hysd bar reinforcement in super-structure complete as per drawing and technical specifications 16.18:replacement of damaged concrete railing. 14.7:construction of rcc railing of m30 grade in-situ with 20 mm nominal size aggregate, true to line and grade,
Sector: PWD